Completed Projects

SN Employer Project Details
1 NHIDCL/Madhucon Projects Ltd. Two Laning of existing Hunli-Anini Road on EPC Basic from design Km 37.500 to Km 53.500 (Existing Km 40.160 to Km 56.320) in the state of Arunachal Pradesh on EPC basic
2 BRO/CE(P) Vartak/ABCI Infrastructure Pvt. Ltd. Design and Construction/ Improvement of Balipara- Charduar-Tawang Road Section of National Highway – 13 From Km 70.00 to Km 88.00 (New Location from Km 69.90to Km 87.54) from Existing Cl-9 Specifications to NH Double Lane Specifications in the State of Arunachal Pradesh on Engineering, Procurement & Construction (EPC) Basis Contract.
3 MoRTH/TK Engineering Consortium Pvt. Ltd. Widening and strengthening of exiting road to 2 lane carriageways with paved shoulder from Km 40 to Km 72.4 of NH 61 in the state of Nagaland on EPC Mode (Package II from Km 56 to Km 72.4)
4 MoRTH/TK Engineering Consortium Pvt. Ltd. Widening and strengthening of exiting road to 2 lane carriageways with paved shoulder from Km 40 to Km 72.4 of NH 61 in the state of Nagaland on EPC Mode (Package I from Km 40 to Km 56)
5 NHIDCL Two Laning of existing Hunli-Anini from Design Km 120.000 to Km 130.300 (Total Length 10.300 Km) in the State of Arunachal Pradesh on EPC Basis under SARDP-NE
6 MORTH Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 284.92 to Km 314.25 (Package-8) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
7 MORTH/SRK Constructions & Projects Pvt. Ltd. Construction of 2-lane road of Potin to Pangin section of NH-13 from from Km 314.250 to Km 351.383 (Package-9) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
8 NHIDCL/Vishwas Construction Co. Restoration of existing road from km 76.350 to km 79.700 of NH-717A (i.e. start of Pedong Bypass to Reshi Border) in the State of West Bengal on EPC mode.
9 NHIDCL/KRC Infraprojects Ltd. Construction of High-Altitude Hill road from Dembuen to Bruni from KM 0.000 to KM 36.300 in Anini District of the state of Arunachal
Pradesh on EPC Mode
10 NHIDCL/MKCIL – RSM (JV) Construction of Jia Bharali Bridge along with its approaches and River Training Work from km 25.552 to km 27.500 of NH-37A(New NH-715) in the state of Assam on EPC Mode
11 MORTH/ Bhartia Infra Projects Ltd. Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 77.95 to Km 117.56 (Package-3) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
12 NHIDCL/ VBL-Taksa Tsag (JV) Construction of High-Altitude Hill road from Mipi to Mathun (Basam) from KM 0.000 to KM 16.730 in Anini District of the state of Arunachal Pradesh on EPC Mode
13 MORTH/ ARSS Construction of 4 laning of Itanagar to Bandardewa section of NH 415 from Chainage Km. 51+700 to Km. 59+199 in the state of Arunachal Pradesh (Package-C)