+91 8972378881
Mon - Sat 8:00 - 17:30, Sunday - CLOSED

Ongoing Projects

SN Principal Work Detail
1 NHIDCL Two Laning of existing Hunli-Anini from Design Km 120.000 to Km 130.300 (Total Length 10.300 Km) in the State of Arunachal Pradesh on EPC Basis under SARDP-NE
2 PWD, R & B, Nagaland Construction of 2lane road from Kikheyi Village-Tohokhu-Aghunaqa Hq Road (Length 35 Kms) under EI Scheme in the state of Nagaland
3 NHIDCL/Progressive Construction Ltd. Widening and strengthening earth work upto top Sub Grade including excavation irrespective of individual quantities of soil/soft rock, hard rock etc as per specification at rate 3.08 Cr per Km from Km 53.500 to 68.800 of Hunli-Anini Road in Aruncahal Pradesh
4 MoRTH/TK Engineering Consortium Pvt. Ltd. Widening and Strengthening of exiting road to 2 lane carriageway with paved shoulder from Km 40 to Km 72.4 of NH 61 in the state of Nagaland on EPC Mode (Package I from Km 40 to Km 56)
5 MoRTH/TK Engineering Consortium Pvt. Ltd. Widening and Strengthening of exiting road to 2 lane carriageway with paved shoulder from Km 40 to Km 72.4 of NH 61 in the state of Nagaland on EPC Mode (Package II from Km 56 to Km 72.4)
6 Executive Engineer, RWD, Aalo Road from Darak to Boruraksap (Full Stage) Total Length 10.92 Km
7 Executive Engineer, RWD, Anini Road from Anini District Headquarter to Moronli
8 MORTH Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 284.92 to Km 314.25 (Package-8)on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
9 NHIDCL Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of section from start of Pedong Bypass to Reshi Border Km 79+700 to Km 96+254 of NH-717A under SARDP-NE Phase ‘A’ on EPC basis in the state of West Bengal- Package VB (2nd Call)
10 MORTH Widening of existing single/ intermediate lane road to 2 lane road from km 72.40 to km 83.00 on NH-61 in the state of Nagaland
11 NHIDCL/A G Construction Construction of 2-lane with paved shoulder of new greenfiled alignement from Helipad at Menla at Km 82.00 to Menla at Km 94.030 of Rhenok Menla spur (NH 717B) Package III B on EPC Basis under SARDP NE Phase B A in the state of Sikkim.
12 NHIDCL/LGC – YCC (JV) Construction and upgradation of existing road to 2-lane with Paved shoulder from km. 20.340 (Rongli Bazzar) to km. 26.588 (Rongli Bypass End) and upgradation of existing road at km 20.600 & km 26.400 for length of 0.520 km & 0.554 km of Rhenok – Menla spur (NH-717B) Package-II A on EPC Basis under SARDPNE Phase ‘A’ in the State of Sikkim
13 NHIDCL/Suryodaya Infra Projects (I) Pvt. Ltd. Realignment of NH717A from Design CH: 0.00 (Km 77.800 of NH-10) to Design CH:2.00 (Km 3.100 of NH-717A) with two lane paved shoulder including Major Bridge of 680 m in the State of Sikkim on EPC Mode
14 MORTH/Bhartia Infra Projects Ltd. Construction of 2-lane road of Potin to Pangin section of NH-13 from from Km 77.95 to Km 117.56 (Package-3) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
15 BRO Design and Construction Of Cl-9 Road as part of ICBR Works from Banga Janga Gompa (BJG) to Naga GG (NGG) Between Chainage Km 20.00 To Km 54.00 (Net Length 36.694 Km) through EPC mode of execution to Include Formation, Permanent & Surfacing Works in Area Of Responsibility of Project Vartak in The State of Arunachal Pradesh
16 NHIDCL/ MKCIL-RSM (JV) Construction of Jia Bharali Bridge along with its approaches and river training works from Km 25.552 to Km 27.500 of NH-37A (New NH-715) in the state of Assam on EPC Mode.
17 NHIDCL/Vishwas Construction Co Restoration of existing road from km 76.350 to km 79.700 of NH-717A (i.e. start of Pedong Bypass to Reshi Border) in the State of West Bengal on EPC Mode.
18 MORTH/SRK Constructions & Projects Pvt. Ltd. Construction of 2 lane road of Potin to Pangin of NH-13 from Km Km 314.25 to Km 351.383 (Package 9) in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
19 NHAI Rehabilitation & widening work for 2- Lane with Paved Shouldering of Existing NH-80 Alignment from Km. 132.895 to Km 190.150 Bhagalpur – Kahalgaon – Mirzachowki section in the State of Bihar