+91 8972378881
Mon - Sat 8:00 - 17:30, Sunday - CLOSED

Ongoing Projects

SN Employer Project Details
1 PWD, R & B, Nagaland Construction of 2lane road from Kikheyi Village-Tohokhu-Aghunaqa Hq Road (Length 35 Kms) under EI Scheme in the state of Nagaland
2 NHIDCL Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of section from start of Pedong Bypass to Reshi Border Km 79+700 to Km 96+254 of NH-717A under SARDP-NE Phase ‘A’ on EPC basis in the state of West Bengal- Package VB (2nd Call)
3 MORTH Widening of existing single/ intermediate lane road to 2 lane road from km 72.40 to km 83.00 on NH-61 in the state of Nagaland
4 NHIDCL/Suryodaya Infra Projects Pvt. Ltd. Realignment of NH-717 A from Design Ch. 0.00 (km 77.800 of NH-10) to Design Ch. 2.00 (km 3.100 of NH-717 A) with two lane paved shoulder including Major Bridge of 680 m in the state of Sikkim on EPC Mode
5 BRO/CE(P) Vartak Design and Construction of Cl-9 Road as part of ICBR Works from Banga Janga Gompa (BJG) to Naga GG (NGG) Between Chainage Km 20.00 To Km 54.00 (Net Length 36.694 Km) through EPC mode of execution to Include Formation, Permanent & Surfacing Works in Area of Responsibility of Project Vartak in The State of Arunachal Pradesh
6 MORTH Rehabilitation & widening work for 2- Lane with Paved Shouldering of Existing NH-80 Alignment from Km. 132.895 to Km 190.150 Bhagalpur – Kahalgaon – Mirzachowki section in the State of Bihar
7 NHIDCL/AGC Infracon Pvt. Ltd. Construction of 2 laning with paved shoulder of new greenfield alignment from Helipad near Menla at km. 82+000 to Menla at Km 94+030 of Rhenok – Menla spur (NH-717B) Package-IIIB on EPC Basis under SARDP-NE Phase ‘A’ in the State of Sikkim.
8 BRO/CE(P), Himank Construction and Upgradation to NHDL specification from Km 60.562 (Salsa LA Pass) to Km 96.577 (Chumur) (Design Chainage Km 60+562 to Km 96+577) (Km 60+562 Reckoned at Salsa LA Pass and Km 96+577 Reckoned at Chumur) of Road HANLE-CHUMAR under project Himank in Ladakh (UT) on EPC Mode (Length 36.015 Km)
9 NHIDCL Widening/Improvement to 4 (Four) Lane with Paved Shoulder from Ch. 99+930 km to Ch.143+680 km (Design Ch.96+000km to Ch.139+750km) for Package-8 of Bilasipura- Guwahati road (NH 17) (Section: Paikan to Dhupdhara Sahar) in the state of Assam on EPC mode.
10 NHIDCL Four laning of Silchar – Dhanehari section (Package-1) from Existing Chainage km 263+800 of NH 37 to km 12+920 of NH 306 (Design Chainage km 0+000 to km 20+000) on Silchar – Vairengte – Sairang road in the State of Assam under Bharatmala Pariyojna on EPC mode. (Project Length – 20.00 km)
11 NHIDCL Widening/Improvement to 4 (Four) Lane with Paved Shoulder from km 626+030 (Nalani hulla Gaon) to km 650+450 (Chotahapjan) on existing Tinsukhia -Makum Bypass of NH-15 (OLD NH-37) and strengthening of existing NH-315 (OLD NH-38) from Km 0+000 (Chotahapjan) to Km 16+900 (Bogapani section) (2-Lane +PS) in the State of Assam on EPC mode (section-3)
12 NE Railway Construction of New BG Railway Line Project from Murkongselek station in the state of Assam (Ch: 0.780 Km) to proposed Pasighat station in the state of Arunachal Pradesh (Ch: 27.062 Km) including Electrical (General), Signal and Telecommunication works
13 NHIDCL Improvement and widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: 24.819 Km, Pkg-01) in the state of Arunachal Pradesh on EPC mode
14 L&T Construction of Access Roads to Project Dam Site, Left Bank Road Network, Dam Site Right Bank Road Network for Dibang Multipurpose Project Lot 02.
15 NHIDCL Construction of Intermediate Lane of Pango to Jorging Road from Design Km 0+000 to Design Km 40+000 (Design Length: 40.00 Km, Pkg- I, Greenfield Alignment) in the State of Arunachal Pradesh on EPC mode
16 MES/GDCL CA NO. CESZ/LPH/10 OF 2022-23: Provision of OTM Accommodation (PH-1) at Lohitpur in the state of Arunachal Pradesh.